Wastewater Treatment System Replacement
Description
Innovative Project Solutions (IPS) provided design-build services for the replacement of the current Acid Waste Neutralization (AWN) system and dozen pump station across the fabrication.
These services included:
- Design and construction of the replacement AWN system.
- Collaboration with our vendor Aquatech for the new AWN system, pre-filter, and equalization tanks.
- Complete design-build services for architectural, civil, structural, process, mechanical, and piping for the project.
- Phasing including demolition of the existing AWN system and installation of the new AWN system.
- Building of a temporary AWN system to allow the shutdown of the existing system.
- Design collaboration with Aquatech to create process flow diagrams and P&ID for the AWN system.
- Permit Set drawings for submission to the city.
With IPS as the Design-Build contractor and Aquatech as the AWN vendor, the IPS Construction team is currently working to finalize the GMP for the construction and installation of the system.
Project Details
LOCATION
Santa Clara, CA
MARKET
High Tech
SERVICES
- Design
- Construction
KEY SYSTEMS
- Acid Waste Neutralization
Company Profile
The client is a leading provider of electronic design and test solutions. The company offers software design tools and services, which are used in the design, simulation, development, manufacturing, installation, deployment, validation, optimization, and secure operation of electronic systems.